INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

fema 350 bolted flange plate moment connection

fema 350 bolted flange plate moment connection

fema 350 bolted flange plate moment connection

(OP)
I'm running into a problem with a moment connection and I was wondering if anybody could shed some light. I have a W18x119 beam (25'long) framing into a W18x143 column. It's designed to be an OMF. These sizes were picked to meet drift. I want to use a bolted connection to avoid alot of full pen welding in the field. I'm working through fema 350's design steps for a BFP connection (see fema 350 section 3.6.3.1). I calculate that Mpr is 16572 kip-in for the first step. This is basically the full plastic strength of the beam. So far so good. However, in the second step, I calculate Mf (moment at the face of the column) is 82458 kip-in! (see fema figure 3.3 - Mf = Mpr+ 2Mpr(x)/L') This is unbelievably large - way more than the actual capacity of the beam. The plate size and number of bolts required to make this work is enormous. What am I doing wrong? Thanks.       

RE: fema 350 bolted flange plate moment connection

nitnelion
i belive that Mf reflects the condition that you are 'forcing' the plastic hinge into the beam away from the connection.  The prequalifed connection testing and design critera are to ensure that significant plastic deformation occurs away from the connection and in the beam section.  I would suggest checking your 'x' distance and/ try reducing it (perhaps a different connection, i'm fond of extended end-plates). Also, if you only need a OMF, you do not need to use a prequlified connection design.  I reccomend you look over AISC Seismic Provisions for Structural Steel Buildings, Part I, section 11.2a.  I typically use the design and detail of the prequalifed connections for the reduced flextural strenth.

RE: fema 350 bolted flange plate moment connection

What if you went with a "dog bone" plastic region in teh beam to reduce the moment capacity of the beam and ultimately of the connection?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources