INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Relationship b/n Price and Genset Voltage

Relationship b/n Price and Genset Voltage

Relationship b/n Price and Genset Voltage

(OP)
This is probably an easy one for those of you who have gone through and done a feasability on a LV vs. MV design for a site.  I am about to do this but have little idea what relationship exists between a generator's voltage and its cost.  What factors influence this, or is it more or less a wash.  I have found plenty of subjects on this on EngTips but there is little mention of capital costs on a equipment by equipment basis. (ie: 12470/480 1000kVA XFMR vs 480/208 1000kVA XFMR)

I am particularily wondering about the genset, and also what availability exists for 'odd' voltages for the major manufacturers.  I have run into a couple major manufacturers who just provide documentation on the standard voltages.  If anyone has access to an updated, free, online MEANS like estimation tool this would be useful.!
Thanks!

RE: Relationship b/n Price and Genset Voltage

Cost is only one of the factors, usually less important to make a final design decision on a system probably suitable for MV application.

Your best approach would be to hire professionals to do a schematic design and have professional estimator estimate the project cost.

Any other excercise is meaningless

Plus its not only the cost of one equipment such a genset or the transformer, but the entire installtion needs to be considered. Cost also varies by geographic location. Cost is also relative to what you are trying to accomplish.

A project for a school is lot different than for a mission critical facility.





 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources