INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Clean out door stress relief

Clean out door stress relief

Clean out door stress relief

(OP)
We have a fixed roof tank with a flush type clean out door, which is required to be stress relieved in accordance with API 650.

The problem is that the tank fabricator installed the door into the tank without completing all the welds, but stress relieving was however performed on the incomplete section. Now I believe we have to apply another round of stress relieving after the completion final welds on site.

Thermal stress relieving is impractical at the project site, would it be possible to satisfy API 650 by applying acoustic / vibrating stress relieving?

Any suggestions to save this without having to replace the clean out door section?

Thanks

RE: Clean out door stress relief

You could remove the cleanout door section, stress relieve it, and then reassemble.

Check if App. A has any exemptions applicable to the tank.

 

RE: Clean out door stress relief

Which welds were completed at site?

Joe Tank

RE: Clean out door stress relief

(OP)
The section was not fabricated into a shell section, so all welds related to the connection to the shell was not finalised. The pad, nozzle, flange was completed and the pad to 40mm floor insert was tack welded.

We cannot use Appendix A due to the nozzle neck of 20mm and the floor insert of 40mm, I am not familiar with the design to know why the neck is so thick.

The fabricator did not want to install the prefab section due to fears of peaking and banding. There are some serious QA/QC issues, as the QCP was set up correctly, but implemented incorrectly.

RE: Clean out door stress relief

I think Mr Stephen has stated the obvious solution to your problem.

Joe Tank

RE: Clean out door stress relief

(OP)
Thanks, I did not think there was a way out of it!

Any comments on the vibration stress relieving?

RE: Clean out door stress relief

Vibratory stress relief is not permitted by API-650.  Only thermal stress relief is acceptable.

Joe Tank

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources