I am trying to find information to determine the maximum recommended spacing for control joints.
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
fibermesh reinforced concrete slabs on grade
|
fibermesh reinforced concrete slabs on gradefibermesh reinforced concrete slabs on grade(OP)
I am trying to find information to determine the maximum recommended spacing for control joints.
Red Flag SubmittedThank you for helping keep Eng-Tips Forums free from inappropriate posts. Reply To This ThreadPosting in the Eng-Tips forums is a member-only feature.Click Here to join Eng-Tips and talk with other members! |
ResourcesWhat is rapid injection molding? For engineers working with tight product design timelines, rapid injection molding can be a critical tool for prototyping and testing functional models. Download Now
The world has changed considerably since the 1980s, when CAD first started displacing drafting tables. Download Now
Prototyping has always been a critical part of product development. Download Now
As the cloud is increasingly adopted for product development, questions remain as to just how cloud software tools compare to on-premise solutions. Download Now
|
RE: fibermesh reinforced concrete slabs on grade
In a reference table in this booklet, the maximum control joint spacing is given as follows (for 3/4" aggregate):
For concrete slump 4-6": slab thickness times 24
For concrete slump <4": slab thickness times 36
In practice, control joint spacing tends to be somewhat larger than these values. Employing good curing practices (moisture control, temperature control, not finishing the surface excessively) will reduce dependence on control joints for crack control. Reinforcing also reduces the need for having such tight spacing. Generally, for reinforced slabs, 16'-20' spacing would not be unreasonable.
RE: fibermesh reinforced concrete slabs on grade
Consider that thin slabs on grade have large surface areas relative to their cross sections and shrinkage is exacerbated by this. Keep the jointed areas to somewhat less than 400 square feet. This would be a MAXIMUM 20x20 joint pattern. Even this is too large under a couple of conditions; i.e., if the slab is less than 6 inches thick or if placed under fast drying or setting conditions. Would prefer to see joint pattern of 15x15 or so, trying to maintain 1:1 length-to-width ratio. Do not exceed 1.2:1 ratio, as random cracks increase with larger ratios.
Next, consider the timing of sawcuts. Saw the joints quickly!! As soon as the concrete is finished and will support the sawing without aggregate raveling, get on it. This can be anywhere from 6 to 12 hours after placement. If you wait more than about 12 hours, you probably will already have some cracks, whether you see them or not. Cut the joint to a depth of 20 to 25 percent of the thickness.
RE: fibermesh reinforced concrete slabs on grade
plain concrete (no wwf or rebar):
24xthickness for aggregate < 3/4", 15 ft. maximum
30x thickness for aggregate > 3/4", 15 ft. maximum
36 x thickness for low slump conrete(undefined), 15 ft. max
for reinforced slabs, 48 x thickness
markdaski@aol.com
RE: fibermesh reinforced concrete slabs on grade
RE: fibermesh reinforced concrete slabs on grade
RE: fibermesh reinforced concrete slabs on grade
RE: fibermesh reinforced concrete slabs on grade
Curling of Slabs on Grade is also dependent upon the amount of material in the mix, usually very fine, which can shrink. It is appropriate to minimize the amount of finer particles, to include cement. I have found higher strength concrete experiences higher shrinage.
If possible, reduce the Design Strength to allow less cement. The use of larger aggregate decreases the relative amount of past. so use a larger maximum aggregate. It may be possible to increase the coarse aggregate percentage, as workability in a 6" slab may not be quite as critical.
The minimal use of Chemical Water Reducers may be appropriate. Careful inspection of the Chemical 'Tech Sheets' may reveal that the chemical addition may increase the amount of concrete shrinkage.
Curing is extremely important. Curing starts with the subgrade preparation and ends several days after the concrete is placed.
I recommend careful reading of ACI 302.1R-96 & 360R-92(97) with extra attention to Chapter 9, Reducung the effects of Slab Shrinkage and Curling.