INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PEMB Foundation Design Loads

PEMB Foundation Design Loads

PEMB Foundation Design Loads

(OP)
I am under the impression that the Pre-Engineered Metal Building (PEMB) manufacturers typically provide unfactored loads, and it is the foundation designer's responsibility to apply the appropriate load factors and combinations to design the foundation system.

One of my supervisors recently expressed the opinion that the PEMB manufacturer should provide the factored and combined loads.

I'm looking for other opinions on who should be doing the factoring and combining for PEMB foundation design, and the reasoning behind the opinions.

Thanks
-NKT

RE: PEMB Foundation Design Loads

I hate to disagree with a supervisor, as I am one, but I'd rather get raw load data and combine them myself.  There are subtleties to load combinations (uplift, 1.6 LL vs. 1.7 LL) that I'd like to interpret myself.
Plus it's much easier to verify the load quantities if they're separate.

RE: PEMB Foundation Design Loads

The PEMB mfr has given me the raw cases and the load combinations they used to design the building. They included the ASD factors on the combos since that is what they designed the building for.

I had to take the raw cases and factor for the concrete design and make any adjustments required at service level for the soil design.

My thought is that they should be able to provide you with the raw cases and combos they designed the building under, but it is your responsibility to modify as required for the foundation system design, as you stated above. You really should be getting a copy of the combos they used for the building design anyway if you are the engineer of record on the project.   

RE: PEMB Foundation Design Loads

(OP)
Thanks JedClampett

Just to clarify, the supervisor in question is new, at a different regional office, and is more inclined toward site development work than structural. Maybe supervisor is the wrong word - he is just further up the corporate ladder than I am. His comment came as a response to a scope of work I had written for the structural portion of one of his proposals. There is no animosity involved, just a differing of opinions on this particular subject.
 
haynewp:
That's my line of reasoning as well. Good point on the EOR reviewing the building manufacturer's calcs.  

RE: PEMB Foundation Design Loads

I've seen the loads come in both factored and unfactored (service loads).  I like to do my own load combinations.  Sometimes we get both the factored and unfactored loads and I run my own combinations and see how they compare with the PEMB mfr factored loads.  It really depends on which PEMB mfr. you are dealing with.

As a side note, sometimes we are asked to provide loads to a foundation designer or soils engineer.  I always provide them the service loads because I do not want to be responsible for some obscure load case governing their design.
 

RE: PEMB Foundation Design Loads

I have done some work will prefab electrical substations that house some serious equipment tonnage.

I always provided the foundation designer will an output summary of the reactions, this included both primary and combination load cases.

As I was using a second-order analysis to design the buildings, the combination load cases was not necessary the case of superimposing primary load cases together.
 

RE: PEMB Foundation Design Loads

unfactored loads def. then you can decide most critical load combos. Its also sometimes difficult to assess how the combos are put together, and if you feel you want to check another load case you have nothing to work from. Have recieved both, and for me, much simpler to have unfactored.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources