INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

A circular culvert feeds into box culvert - how to evaluate in HEC-RAS
2

A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

(OP)
I am evaluating an existing CSP under a highway that ties into a concrete box culvert (50m of CSP while 55m of Conc. box). The suggestion is to line the existing CSP (which is in a pretty bad condition) and provide a manhole at the tie-up to improve the hydraulics. If the lininng affects the culvert efficiency (diameter to downsize from 2m to 1.7m)then a seperate CSP will be put in place along the existing culvert. Although I can utilise other softwares however, I am utilising HEC-RAS as we have to be careful about the upstream water surface levels too. I am thinking of a cross-section at the junction of CSP and box culverts. Could someone help me out with this strange and complex situation?

Thanks in advance and your help will be higly apprecited.    

RE: A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

     Lining the bottom one fourth of a corrugated steel pipe diameter with smooth troweled concrete will INCREASE the flow characteristics, (Manning's coefficient is smaller for the smooth invert).  Parallel lines can require a splitter box to assure sufficient flow depths for minimum velocities.

RE: A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

(OP)
civilperson, thanks for your reply. I understand that but my problem is evaluating it in HEC-RAS. I am not sure how to model and evaluate the two different material culverts (upstream CSP and downstrean concrete box) in HEC-RAS. I am thinking of taking a cross-section at the junction of the two but not sure whether hydraulically it will be OK.

Thanks.

RE: A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

Can you establish the hydraulic charateristics of the junction and CSP externally usiong standard hydraulics?  Use the computed headwater as your starting condition for your HECRAS model from the inlet upstream.

RE: A circular culvert feeds into box culvert - how to evaluate in HEC-RAS

HEC-RAS does not have the capability to properly model this type of crossing - where the pipe shape & size changes. The best method is perform the culvert calculations outside of HEC-RAS, using the downstream data provided by the model. Then manually input the crossing's headloss into HEC-RAS for the upstream wsel calculations.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources