INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Mill Test Report for boiler tubes

Mill Test Report for boiler tubes

Mill Test Report for boiler tubes

(OP)
Hello,

I work in a 2x150MW Coal fired utility located in Colombia, South America. We will change the reheater tubes in next October so I've been selected by the company to inspect the tubes and their Mill Test Reports in factory prior to shipment. The factories are located in Houston and Detroit. What do I need to know prior to the inspection? Are there special things to check during visit? I'm a mechanical engineering and I'm asking this because this is the first time I do this, even when I have some ideas about things to check during inspection, I don't want to pass by any important check prior to shipment, and our company want to be sure about the correct fabrication and quality of the tubes bought.

The tubes are 1.750", 2.000", 2.2500, 2.500" diameter; and 0.135", 0.150". 0.180" thickness, in the following materials:

SA-209T1
SA-213T11
SA-213T12
SA-213T22
SA-213TP304H
SA-213TP347H

Thanks for your help!
 

Javier Guevara E.
Projects, Mechanical Engineer
TERMOGUAJIRA - GECELCA S.A. E.S.P.

RE: Mill Test Report for boiler tubes

Javier Guevara E.;
I have done many of these vendor audits/reviews for boiler pressure parts we purchase. First, bring a copy of ASME SA 213 Specification with you including SA-450, and your bid specification that was issued when you purchased the tubes. Armed with the necessary specifications, review the entire fabrication process, job travelers, bending, welding, mechanical testing and their laboratory to view corrosion testing (if specified). Request to view any nonconformance items associated with your order. On the front end request all material test reports to view the original sourcing of the steel used to make the tubing.

Once the above is completed, roam the shop floor and request an inspection of several finished tube samples from your tube order to judge the level of quality/workmanship and material handling. Bring a set of calipers with you to check OD, wall thickness and a good flashlight to view the tube bores.

Finally, review the shop layout, equipment, their Quality Program for future tube orders.

RE: Mill Test Report for boiler tubes

In addition to SA-213 and SA-450 copy also specifications SA-209 and SA-1016 to check T1-material....

RE: Mill Test Report for boiler tubes

Ask to see some resume's or CV's of key people, quality control, inspectors, welders, production control personnel and anyone else that you think a critical part of the process.

rmw

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.