INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Gas turbine Sizing

Gas turbine Sizing

Gas turbine Sizing

(OP)
Hi all,
Which type of Gas turbine  is the best for a plant  that needs both steam (23tonnes/hr ,18 bar,350 degrees centigrade ) and  power  (10MW)
      a)Dual pressure Combined cycle with condensing extraction steam turbine
      b)Single pressure Combined cycle with condensing     extraction steam turbine
     c)Gas turbine and  HRSG without steam turbine.
Regards

RE: Gas turbine Sizing

mango,

Your choice of equipment is very dependent on several other factors such as :

1)  What is your yearly load profile for both steam and power ?

2)  What will be the skill level of the staff ?

3)  What will be the cost of fuel ?

4)  Your need for steam if the GT is out of service.

and most importantly....

5)   How much can you afford to spend and when do you want it ????/?

There is not a single simple answer to this question. There are several "candidate" plant configurations to consider. Developing a short list of those plants is your first step

-MJC

   

RE: Gas turbine Sizing

myango,

HRSGs on gas turbines at 10MW and below are almost never dual pressure with reheat, and rarely operate in combined cycle. It is typical for them to make steam for plant use only.
The reason for this is economics. In a plant of this size, it usually not cost-effective to produce electricity from natural gas in combined cycle vs. combined heat and power due to the relatively large capital cost of the steam cycle components. In other words, the money saved by the additional electric power generated by the steam cycle vs. buying off the grid may not be enought to pay off the additional capital cost of the steam turbine and associated componenets in a reasonable period.
Your situation will depend on all of the things mentioned above by MJCronin. If the electrical rates are high compared to gas, it could make sense to do a combined cycle.
Assuming your electrical base load is 10MW, you should be able to generate the 10MW in a GT and get the 23 tonnes/hr of steam for the plant without additional fuel.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources