INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tie into 24" Storm Force Main
3

Tie into 24" Storm Force Main

Tie into 24" Storm Force Main

(OP)
The storm drain system from the new development site should be connected to the existing 24" Storm Force Main. What is the most critical point for designing this?

The storm pipe from the new site is 6" (force main as well). There would be some pressure issues at the point of interest. Can I have any suggestion or engineering advice to design this connection?

Thanks in advance!

RE: Tie into 24" Storm Force Main

a little more information might be helpful

RE: Tie into 24" Storm Force Main

Check with your local highway department (DOT). They will have standard details on line that you can use.

I am not aware of any critical issues in making such a connection.

It is preferable that the force main enters the manhole from the opposite side of the mh from the discharge pipe.

          
 

RE: Tie into 24" Storm Force Main

it seems that if you are connecting one force main to another force main, there will not be a manhole, instead it would be a tee or wye fitting of some kind between two pressure pipes.  However, the larger implication in my mind is pump station design and backflow prevention.  These may be the "pressure issues" that gtg2020 alludes to. There may be a need for a check valve on one of the force mains at this location to prevent backflow.  There may also be a need to alter one or both of the pump stations to handle the change in flow and pressure. Thrust restraint should also be considered. Again, if gtg2020 will provide some information, the tips could be addressed to his actual concerns.

RE: Tie into 24" Storm Force Main

Put the connection in a junction box or Manhole for future access.  Check the hydralic head at the connection point, have 6" pipe be higher pressure than the 24" pipe. Use isolation valves before/after the junction on both lines to avoid hot tap.

RE: Tie into 24" Storm Force Main

if this is storm drainage, I don't see the need for hot tap. I would not schedule the work during the rainy season. wait until the weatherman says no rain.  cut out and install the valves and tees plus thrust block or restrained joints.  valve vault would be useful for the check valve or the isolation valve.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources