INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Do we to include ARV & BOW on sewer force main design!

Do we to include ARV & BOW on sewer force main design!

Do we to include ARV & BOW on sewer force main design!

(OP)
i am new here and currently working on a project that designing sewer force main. i am wondering do i need to consider the air release valve and blow off valve for the sewer force main design? and how do the maintenance guys handle air release (sewer) when opening the valve? appreciates the advice and thanks a lot!

RE: Do we to include ARV & BOW on sewer force main design!

You are talking about 2 different valves. The air release should be installed at the high point of the forcemain. Consider the use of a manual instead of automatic air release to prevent a sewage spill in the event the valve does not fully close. Material in the sewer has been know to jam the valves and prevent closing.

The blow off valve is normally installed close to the lift station.

If you design the system properly, the air release will only occur on system startup, not during normal operations.

RE: Do we to include ARV & BOW on sewer force main design!

(OP)
Thanks for the information.
I thought all the valves are operated manually!
Why the blow off valve is normally installed close to the lift station? Thanks again!  

RE: Do we to include ARV & BOW on sewer force main design!

It is recommended that a clean-out or blowoff be provided at low points, but it is not generally mandatory by the reviewing agency.

Most specifiers put the blow off valve close to the lift station, probably so the clean out valve can be used to clean out the lift station.

RE: Do we to include ARV & BOW on sewer force main design!

(OP)
Thanks again!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources