INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Spectacle Bilnds

Spectacle Bilnds

Spectacle Bilnds

(OP)
is it more common to have spectacle blinds made from plate or have them forged.  We have some that are 16" Class 600.  Also, what about a raised face or not?
thanks
mark

RE: Spectacle Bilnds

(OP)
I noticed the sheet you sent says not to use them for hydrostatic testing.  Why is that?
thanks again
mark

RE: Spectacle Bilnds

Should they be different?
And why then?

RE: Spectacle Bilnds

Gentlemen,

It is my understanding that spec blinds are not to be used for hydros for the distinct purpose that they might not meet the flange ratings of testing.  Thicknesses of spec blinds are not the same as testing blinds.  Spec blinds are used for blanking off lines for work down stream of lines.  Maybe this will answer some things.  Correct me if I am wrong.

Eric

RE: Spectacle Bilnds

Well, you could adopt ASME B16.48 as your line blank (a.k.a. "slip blind") standard. It includes Figure-8 Blanks (a.k.a. spectacle blinds). It is one of the referenced standards in B31.3, so legal for use in B31.3 systems. The design is based on B31.3-2002 (see the Foreword). Cheap at $58. http://catalog.asme.org/Codes/PrintBook/B1648_2005_Line_Blanks.cfm

If you go by that standard then acceptable materials are per B16.5 Table 1A which includes plate materials.

From 3.3.1, A raised face may be specified at the option of the purchaser.

Ratings are per B16.5. As for hydrotesting, 2.2.2 states that Line blanks may be subjected to system tests at a pressure not to exceed 1.5 times the 38°C (100°F) rating rounded off to the next higher 1 bar (25 psi) increment... So it would appear that the blinds (if B16.48 compliant) are considered to be adequate for hydrotests.

jt

RE: Spectacle Bilnds

Eric,
Spectacle blinds are calculated and used for full press.requirements and spades are used for seperations of systems for whatever reasons.

Greetings
 

RE: Spectacle Bilnds

(OP)
Thanks for all the info.  This is a bit of a strange situation.

This spectacle blind is in a 16" line and is a Class 600 system.  It is part of a depressurization system and the blind is used only for hydro-testing purposes.  Seems like an expensive setup (2 16"CL600 stainless RFWN flanges, hardware, and the blind) for just a single use.

RE: Spectacle Bilnds

pipe15,
You may calculate to use carbon steel plate for hydrostatic test.

RE: Spectacle Bilnds

Pipe 15,
even if cost difference beetween  Paddle Blinds Forged and those made from Plate is very variable and not so high as you could expect, basically i'll say: it's most common to specify them form plate.
Otherwise, if your blanks are in CS on services which could cause severe stress corrosion cracking and/or Hydrogen Induced Cracking my advice is to specify forged blanks, in this sense, you have to consider that a blank made from a plate HIC tested is much more expensive than a forged one.

Bye

Giuss

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources