INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Plant Inspection

Plant Inspection

Plant Inspection

(OP)
Hi everyone,
I need help on what PLANT INSPECTION MANAGEMENT SYSTEM regarding oil and gas plant is all about and if possible, any materials that could be of help.

Thanks

Chitel

RE: Plant Inspection


The document bellow is a good start for a plant inspection

"Risk-based Inspection
API RECOMMENDED PRACTICE 580"

About RBI software management go to the site bellow

http://www.equityeng.com/

Regards


Luis Marques

RE: Plant Inspection

I was exposed to a Risk Based program when I had to work with DOW, not for them, with them in the early 90's.  Their 100 years of risk experience allowed them to quatify a lot of stuff associated with risk.

About the same time,an ex dOW employee wrote a book about pipeline risk assesment, Kent Muhlbauer, which I used to development some inspection intervals.  All of this before pipeline integrety rules came out.

In 1996 I went to work in plant environment.  I adopted the risk assesments developed by DOW, publishe by Kent M. to do piping, vessels, rlief, and safety systems.  Now thanks to SJones link, I have a peer credible backup for a proram I developed.

The program takes the line, veseel, ect lists you have.  Then operations and Engineering answers about 10 questions about the line and its contents.  Then based on an agreed upon value, each answer is scored and the lines risk value is established. For example, a line with <4 ppm H2S = 1, <50 ppm= 10 and over 50 pmm= 50. Things like water saturation level, material = SS or CS, ect..  These give the relative probability of failure.

Then 10 more questions about the consequences, so liquids versus gases, high versus low pressure, toxicity, ect.  The consequence times probability equals risk.  Or a look up table like those used in Hazop gives the overall risk.

The over all risk drive the inspection time. Again based on a table predetermained with a 10 year max on pipe and 5 year on relief valves, 10 years on vessel, and 2 years on controls.

It's all set up in a spread sheet and the math and look ups are automatic.  one of the questions on probability also includes a score for prior history so there is feed back into the risk.

I'll review the SJones paper again too.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.