INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

To Use Load Combinations Or Load Factor?

To Use Load Combinations Or Load Factor?

To Use Load Combinations Or Load Factor?

(OP)
I have a question about the use of load combination and/or load factors in the design of, say, a reinforced concrete footing.  I will need to size an adequate footing, as well as to design the steel reinforcement.  Now, sizing of the footing is done using service loads, while the reinforcement is done using ultimate loads.

In my analysis stage, in Method 1, should I just use the load combinations using allowable stress design to get my service loads, and THEN apply a load factor (1.6, say) to get the ultimate loads for my reinforcement design?  Or should I use Method 2, where I do my analysis using all the possible load combinations using BOTH allowable service design, as well as strength design, or load and reistance factor design?  Your thoughts, feedback, suggestions and advice, please.

RE: To Use Load Combinations Or Load Factor?

Use the ASD load combinations to design for soil bearing (i.e. footing size).

Then use LRFD load combinations to design the concrete and reinforcing.

Two separate sets of combinations are required.

RE: To Use Load Combinations Or Load Factor?

Go with method two. Speaking from experience, it will cause you less headache in the long run.

 

RE: To Use Load Combinations Or Load Factor?

I use method 1.  If the DL/LL ratio is high I multiply the service loads by 1.5 to get an ultimate load.  If the DL/LL ration is small I multiply by 1.6.  I almost never run two sets of load combs.

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources