INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Manufacturing Pressure vessels

Manufacturing Pressure vessels

Manufacturing Pressure vessels

(OP)
Greetings,

Could use some help, direction,generic dwgs, book suggestions or other information.
Currently working on laying out a small PV fabricating facility.
Some Generic info:
Double wall vessels
12-20 per year
Diameter 42" to 70"
12 bar operating pressure Test to 15
Wall thicknes 1/2"
Domed heads both sides

I am more interested in product flow drawings or information to get ideas of what other think/experiences is the best product flow layout, layout of facility and layout of progressive work cells and steps all the way to testing and shipping.

Please let me know if anyone can help.
Thanks
Mike Z.

RE: Manufacturing Pressure vessels

This may not be what you're looking for, but . . .

Assuming these are to be ASME certified pressure vessels, you'll be going to an awful lot of expense/hassle for just 12-20 vessels per year.  On the surface, it looks like a real money loser.

RE: Manufacturing Pressure vessels

Mike Z...

Where will this shop be located ? Within or outside of the US. Will there be ASME certification involved ?

I second the comment stated above...12-20 of these small vessels per year is not much of a stretch. Many of the bigger US shops that I am aware of could knock these off in a couple/three weeks.

You shop layout should include recieving/materials storage (often outside) fabrication area (under a 10-20 Ton overhead crane) and a pressure test area. Storage of completed units can be outside or in a covered area. You should have an office area also.

-MJC

   

RE: Manufacturing Pressure vessels

(OP)
SEMECORP...

I agree with your statements of 12-20 per year.
However, I should have clarified that this would only be for the first year.  Thus our target for 2008.
The facility would be ASME certified and will be located in the midwest.

I am still hoping for "generic" layouts or a box diagram showing flow to make things clearer and have engineering input.

Thanks
Mike Z

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources