Arc Flash Analysis in Power Plants
Arc Flash Analysis in Power Plants
(OP)
Any thoughts on what standards you'd apply in performing an arc flash hazard analysis in a utility-owned power plant in the US? NESC rule 410 appears to be applicable to lines and the NEC does not apply to utility owned power plants so I'm not clear if NFPA 70E applies? Thanks in advance for the feedback!






RE: Arc Flash Analysis in Power Plants
The exemption for electric utilities is more of a political and "turf" issue and has little to do with technical issues in this case.