INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Control Narratives: Recognized Standards, Recommended Methods?

Control Narratives: Recognized Standards, Recommended Methods?

Control Narratives: Recognized Standards, Recommended Methods?

(OP)
Any advice as to standard guides for the creation of robust, standardized control narratives?  Our normal process is this:

- develop PFDs
- develop P&IDs including an intermediate level of info density (say, element bubbles and display bubbles, maybe alarm states if the dwg doesnt get too busy)
- (mech stuff)
- specification of instrumentation based on experience, vendor recommendations, client preference, random number generators etc.
- development of a "control narrative" which attempts to describe the interaction of each instrument element with its environment, related equipment, and the SCADA

"Element X will measure process variable Y over a range of 0 to 100.  Should the value fall below 10, the following alarm conditions occur. Should the value fall above 90, the following alarm conditions occur.  Over the remaining range, the VFD on pump A is spun proportionally to the PV as measured at element X."

A few problems with this.  Wordy, obviously.  Does not lend itself to large systems.  Often ambiguous despite best intentions.  Also, in our firm we have a couple of refugees from Big Chemical (incl yours truly), several veterans of engineering consulting, and a double handful of junior folks that lack experience in-plant or at the desk to be able to meaningfully tease out or interpret a narrative-style control plan.  Most of us think we know EXACTLY what is required, and of course no two of us approach the problem in the same way.

I have been asked to propose a standard approach to packaging the info we currently embody in the control narrative.  Can anyone recommend or even just point to any published guidelines on this topic?  I plan to noodle through my Perry's, Coulson & Richardson etc. but I see some likely docs on the ISA website.  Anything else?  API, ASME etc.?

Thank you in advance to the assembled cognoscenti.

RE: Control Narratives: Recognized Standards, Recommended Methods?

Please take a look at www.urswriter.com
This provides a lot of information on this topic.
Francis

RE: Control Narratives: Recognized Standards, Recommended Methods?

OSHA is performanced based criteria on this topic.  So, your proceedures are the standard. I like a Cause and effect diagram from the old days.  

Also, one of the areas in OSHA PSM says you need a consequence of diviation analysis.  This is also covered in most HAZOP's.  So there is documentation of consequences there also.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.