INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

detention basin

detention basin

detention basin

(OP)
Hi guys:

I got a question regarding detention basin. A contractor come to us saying that water has spill out of berm of the detention basin we design. I went back check my design. the Hydr. part is good enough for 100 years storm, the basin side slope is 3 to 1, and just completed this winter. I was wondering how many different ways that the contractor can mess it causing the water spill out of the detention basin.

thanks guy

RE: detention basin

We had it happen once when logs and debris had blocked the outlet. Has an as-built survey been completed to check the basin volume and stage-storage capacity?

RE: detention basin

not all possibilities are the contractors fault...

contractor could have made it too small, or
contractor could have left a low spot in the berm, or
contractor didn't compact berm well and it settled, or
contractor didn't compact berm well and water piped through causing breach, or
gopher tunneled through the berm, causing a leak, or
outlet pipe could have plugged up, or
hydrology was incorrect, or
you had a 100-year storm, or
you had back to back storms, or
infiltration estimate / perc tests were overstated, or
runoff was diverted from another watershed into your basin, or
skateboarders used the berm for a ramp and wore it down, creating a low spot, or...

RE: detention basin

addition to cvg...
There are even detention and infiltration bassins without any overflow, planned without any doubt about the hydraulic and geotechnical assumptions made for planning...

RE: detention basin

After confirming the as-built, I would check the pre-developed time of concentration and see how accurate it may be.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources