INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NTIW TUBESHEET CALCULATION

NTIW TUBESHEET CALCULATION

NTIW TUBESHEET CALCULATION

(OP)
Dear All,
I have to design NTIW (No Tube In Window) tubesheet of a vertical combined feed exchanger ( 1 pass tubeside with bellows at outlet ).
NTIW tubesheet is not in the scope of ASME VIII div. 1 UHX as well as TEMA standard since not perforated for all the overall circular area, but, with untubed parts at top and bottom (baffle cut is approx. 15%).
 
What is the normal design approach for NTIW tubesheet calculation?

My Client stated in the Spec's that, the exchanger, shall be in compliance with ASME and TEMA ( NO ASME U Stamp Required).

I calculated the tubesheets using either UHX Part or TEMA and I got bigger thickness using UHX respect to TEMA.
In addition the UHX Parts requires to increase the thickness of the barrel adjacent to the stationary top tubesheet.
In conclusion, with TEMA......COST SAVING.

I would proceed using the thickness found with TEMA with the support of FEA analysis ( as admitted by ASME CodeU-2(g))for the untubed parts.

Do you think this is a correct approach???

Anyway, please suggest me what is the normal approach used with your AI for NTIW of fixed tubesheet heat exchanger.

Awaiting for your opinion I thank everybody in advance.

GENGI

RE: NTIW TUBESHEET CALCULATION

gengi, I believe this has been discussed earlier, but my experience has been that you just ignore that the NTIW is not within the scope, and do calculations per TEMA and/or Part UHX (or, these days, both). Never had anybody kick about it.

Since you are not U-stamping, your TEMA / FEA approach should be OK, but you could always run it by your AI and client first.

Regards,

Mike

RE: NTIW TUBESHEET CALCULATION

Is there going to be AI involvement?  You stated above that it is not code stamped.

RE: NTIW TUBESHEET CALCULATION

(OP)
Dear eliebl,

I confirm U-Stamp is not required but there is an AI.

rgds

RE: NTIW TUBESHEET CALCULATION

I have seen designs like these built using TEMA, Part UHX, or FEA as the justification.  It really depends upon what your AI and client are willing to accept.  There was a link to the ASME whitepaper on the development of Part UHX posted previously.  You may want to go through this document to understand what the assumptions of UHX are and how it could be applied to this case.

EJL

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources