INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

AITC Technical Note 26

AITC Technical Note 26

AITC Technical Note 26

(OP)
AITC Technical Note 26 was just brought to my attention
https://aitc-glulam.org/shopcart/details.asp?category=&item=TN-26
This note deals with Glued laminated beams fabricated before 1970.  Apparently before 1970 the grading requirements for laminates were not as stringent as they are today resulting in an over stated Fb.

In the road system under my management I have a pre 1970 glulam bridge that has not undergone any changes in use or structural modifications since it’s construction.  In light of this TN I'm putting a contract together to have the bridge professionally inspected.  
My question is, if this report comes back with no defects noted what are my requirements for implementing this guidance?  Utilizing the reduced Fb will resulting in having to post a very low load rating.  Currently the bridge is rated to a HS-20 load.

Thanks in advance for any help/suggestions

RE: AITC Technical Note 26

Why not take the monkey off your back, have the individual or firm inspecting the bridge put a load rating to it, making sure you inform them in writing of the reduced Fb situation.  Make sure you detail all this in the contract.  See what happens.

Mike McCann
MMC Engineering

RE: AITC Technical Note 26

(OP)
thanks for the advise msquared.  Generaly we do all of our inspections and load ratings in-house so I'm unfamiliar with the contracting aspects of load rating structures.  If we do go the route you've suggested what would drive the ktr to give the bridge a higher load rating than would be suggested by the guidence in TN26?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources