INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Welding After Hydro

Welding After Hydro

Welding After Hydro

(OP)
Quick question, is it permissible to weld insulation pins onto 2205 or 904L after hydro test on Section VIII Div. 1 equipment?  What are the restrictions on types of welds, tig, mig, resistance, etc.  The pins are 3.5" long and the equipment has a long trip to job site and may require us to put on insulation pins depending on where the code stands.  Any help is appreciated.

RE: Welding After Hydro

innovation2;
Simple answer is no, not for Section VIII because of impact concerns and the loss of benefit from a hydrostatic test (local yielding of material and work hardening), for new fabrication. There was a request for code revision regarding Sect I on this same issue and the folks from Section VIII shot it down in flames.

RE: Welding After Hydro

metengr is right.  no welding on vessel after hydrotest and if you have to weld then re-hydro.  The code is clear (in a way) see UG-99a(1).  However, you said insulation pins and that leads me to think you are welding to a skirt (ie. a non pressure part) or support.   Is that correct?  If so, then it would be OK to weld onto non-pressure membrane parts after hydro.  

How many times have we hear this request from fabricators who try to induce/trick the owner/EPC responsible equipment engineer to "interpret" the code meaning?  LOL.

RE: Welding After Hydro

(OP)
The QC is certain there is an exception for capacitor discharge welding.  I am under the assumption that it is not allowed after hydro.  Section VIII is vague on capacitor discharge welding.  Only reference I see is UW-37(h).

RE: Welding After Hydro

(OP)
It is allowable in Section 1 and Section 4 vessels but not in regard to Section 8.  

RE: Welding After Hydro

API-650 permits a limited amount of post-hydro welding.  Maybe your QC guy is thinking of that?

Joe Tank

RE: Welding After Hydro

Guys,

I am looking for information on this as well for a utility boiler. Does anyone have the specific line in Section 8 that says this?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources