Sq-D Masterpact finger cluster problems, read this important safety message.
http:/ /www.pearl 1.org/down loads/Squa re-D-Maste rpack-NW-C ustomer-Le tter-1.pdf
http:/
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Masterpact issues
RE: Masterpact issues
RE: Masterpact issues
Problem occures in less than 0.04% of breakers.
RE: Masterpact issues
RE: Masterpact issues
RE: Masterpact issues
RAF7, when you get a chance, please point me to the instruction book section outlining correct stab thickness for primary injection testing of Masterpack breakers. I just can't seem to find it.
Thank you.
RE: Masterpact issues
Found what I was looking for.
On page 1 of the instruction book!
RE: Masterpact issues
Attached updated letter from Schneider.
Grundig
RE: Masterpact issues
Read between the lines, 0.04% have been reported, sounds small but how would one know they have a problem unless the clips failed?? You wouldnt, it is not like these breakers are being racked in and out often either, most industrial plants they are hardly ever touched.
Lets say you have a double ended substation with 20 of these breakers, there is a .8% chance you have a known problem, now lets say your large industrial plant has 14 of these substations, 11.2% chance you have a known problem, and again thats only because either the clips failed or you were notified by the manufacture about a known problem with the clips.