INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

IS IT WORTH IT?

IS IT WORTH IT?

IS IT WORTH IT?

(OP)
The city I work for is comtenplating contracting with our local Sanitary District (sewage treatment)to allow them to provide billing services for the city sewer charges. It is estimated that the billing would cost the city $250,000per year with an initial startup cost(software) of $100,000. the District would like to trade 20 miles of thier non interceptor sewer in the city for this service. it is estimated the replacement cost would be $100/ foot( this sewer is not in very good shape now) for a cost of $10,560,000. it is also estimated that sewr replacement costs are rising faster than personnel costs. I used an interest rate of 4% for the billing costs and 8% for the sewer replacement costs. where do i take these calcs now, I don"t have any faith in my results.

RE: IS IT WORTH IT?

Take them to a bean counter....  They love this stuff!!

RE: IS IT WORTH IT?

You can reduce all your cost data to some common basis; say Present Worth. Then they are directly comparable. Your old Econ textbook has the formulae you'll need.

good luck

RE: IS IT WORTH IT?

One would think that you would want to make a favorable case for your client.

You should start off with a better estimate of the replacement cost. $100 per foot sounds to be on the low side if you consider the depth of the sewer and if the sewer is in the streets. Street repair and gravel backfill are expensive. You also need to estimate the life of the sewer.

You also have a procurement cost to be added to the $100/foot. The engineering design and constuction alone would add maybe 20% to the total.

Try to find a higher priced and quality estimate for sewer replacement. You also have to determine the typical installation cost of sewer that you are replacing.

$250,000 would buy 2,500 feet of replacement sewer per year at $100 per foot.

2,500/ (20 * 5280) ===  2.3% of system replaced per year.

You also need to determine the annual maintenance cost of the 20 miles of sewers. Who is going to be responible for sewer maintenance?

It sounds like a bad deal for the City. I would look into this further and make sure all of your costs are correct.

RE: IS IT WORTH IT?

If they did the billing for free and reduced your sewer rate by 10%, maybe it would be a wash. bnut tey are getting rid of a dog and charging you for the service. Not a good deal. Look at BIMR's comments. Who did the estimate of replacement cost? And when did they do it? 1965? 8 inch pipe 5 feet deep, in a corn field and the whole 20 milesat one time maybe.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources