INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Piled Foundation and Pipe Support on Soft Ground

Piled Foundation and Pipe Support on Soft Ground

Piled Foundation and Pipe Support on Soft Ground

(OP)
I have a number of domestic projects which require piled foundations(soft ground or filled ground). The foundation design is relatively simple, precast piles and ground beams would be the normal solution in the UK for the particular situations in question.

I am wondering about the requirement for any pipework support or sewage treatment plant support.

On very soft ground I sometimes recommend the clients dig to a stiffer strata, line the excavation with a geotextile and build-up to pipework level with compacted hardcore or trenchfill concrete.

With Filled ground I am wondering if I should take the same approch as any settlements can vary although with about 3.0 metres of fill I would not expect the settlement to be critical (damage pipework or affect falls).

Has anyone any experiance of these situation and if so would you agree with the approch listed or recommend a different approch - if any?

Also would you provide a platform at foundation level around the house to support pipes gullies etc. and if so how would you slieve the pipe as it transfers to the softer ground?

RE: Piled Foundation and Pipe Support on Soft Ground

Where I work, coastal South Carolina, settlement is a big issue. When underground pipelines are pile supported there is an unintended consequence. As the ground continuously settles and the pipelines don't the result is bulges in the ground directly above the pipelines. This plays havoc at road crossings / parking lots and gets worse over time.

Your proposed approach should be much preferable.

www.SlideRuleEra.net idea

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources