INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Plant Demolition

Plant Demolition

Plant Demolition

(OP)
I have recently been promoted to manage the demolition of an upstream oil and gas facility plant. This being my first full-scale management of such a project I thought I could ask for some pointers from members of this group who may have a background in this type of work.

The scope of work includes some of the following:
-source water wells(to be cut and capped)
-monitoring wells(to be cut/capped and abandoned)
-brackish water wells(to be cut/capped and abandoned)
-tank farm(to be removed, possible reclamation work)
-power distribution decommisioning(above and below ground)
-above ground piperack and pipelines(to be purged and demolished)
-waste treatment facility(to be removed, possible reclamation work)

My first thoughts are to designate a cut point list to provide clear direction to site personnel as to where these lines are to be cut. Piling is also an issue, since this area will be used to construct a new phase of the plant once demolition is complete. Existing piles should be asbuilt to avoid possible conflicts with new construction.   

RE: Plant Demolition

first and foremost, congratulations. You probably not only got a raise but you'll have fun now.
From experience in this type of plant demolitions.
Unless you have very, very accurate drawings (which might be unlikely because if the plant was new enough to have them you wouldn't be demolishing it) do your budget and add 50% on top of that for "surprises".
Get a very thorough line locating company. Get a good hydrovac and be thorough.
Yes, there will be lots of reclamation. See what can be grandfathered to the next plant, as you typically do not need to do full reclamation unless the site is to be decomissioned.
I do not know, but in my case we quite often had railcars for tanks. These are straight forward. But if you have these, quite possibly the vertical tanks will have piles underneath. Makes it challenging to remove them.
Be very thorough in the basic engineering. Confirm tie-ins and caps multiple times. It is better when you do it in conjunction with the mechanical and electrical contractors. Get them and the construction (destruction) manager involved as much as possible in the planning stages.
There's lots I could say, but basically, be thorough, patient and enjoy!

RE: Plant Demolition

You may want to check Demolition Engineering which falls under Military Engineers

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources