×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Regeneration in sketcher

Regeneration in sketcher

Regeneration in sketcher

(OP)
I used Pro-E for four years prior to using UG and in Pro-E you could create a sketch, create dimensional constraints, and change the dimensions all at once before the sketch regenerated.  Is there a way in UG to delay regeneration until all dimensional constraints are changed?

RE: Regeneration in sketcher

Yes.  While in the Sketcher, under the Tools pull-down menu, there are 2 items that you need to be aware of.

One is a toggle, 'Delay Sketch Evaulation' and the other is a direct action button, 'Evaluate Sketch'.  As long as the first item is toggled ON, editing sketch dimensions or constraints will have no effect on the sketch.

When you wish to update the Sketch you have several options.  You can either go to Tools and toggle the 'Delay Sketch Evaulation' OFF and the sketch will update.  Or you can select the 'Evaluate Sketch' icon and the sketch will update, but it will have no effect on the status of the toggle status of the 'Delay Sketch Evaluation' icon.  Also note that if the toggle is ON and you've made edits, if you leave the Sketch task, the sketch will automatically update (we do NOT want to leave an unevaluated sketch left sitting in the model waiting to suprise someone).  Be aware though that when you return to the sketch task later, the toggle will still be ON.One other situation that will trigger an update is if you attempt to drag any un/under-constrained curves.  In order to show a valid result we must force an update, so don't be surprised if you run into that.

Note that if you intend to use these tools frequently, you can turn on their icons on the Sketch toolbar.

Now, even if the toggle is ON, you can still add curves and the appropriate constraints will be still be created, such as the tangent constraints when creating a fillet, etc.

Anyway, I think this should provide you the flexiblity that you're looking for.

John R. Baker, P.E.
Product 'Evangelist'
NX Design
Siemens PLM Software Inc.
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/

RE: Regeneration in sketcher

(OP)
Thanks again John.  I will try that first thing tomorrow when I get to the office.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources