INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Anaerobic Digester Pilot Study

Anaerobic Digester Pilot Study

Anaerobic Digester Pilot Study

(OP)
I would like to build a pilot-scale anaerobic digester to demonstrate the advantages of such a system for reducing sludge volume, dewatering odors, and electrical needs at a wastewater plant.  Does anyone have a working knowledge of this process?  If so, I am looking for the following information/advice.

1.  For a continous flow digester, should one really expect a 20 day detention time to completely digest the sludge?  This is the amount of time I have been seeing on various websties and I am amazed that it takes so long.

2.  Can activated sludge from the secondary clarifier be digested or is it only a viable process for sludge from primary clarifiers?

3.  Are there any pictures of pilot scale digesters that I can look at to see a general layout?  I am mainly concerned with the layout of the digester itself rather than the entire setup.  I will need to know where to place baffles, inlets, and outlets, etc.

4.  What reduction in sludge volume should be expected?

5.  How much electricity (ballpark) can be generated from sludge in terms of kwH per lb VSS or TSS?

RE: Anaerobic Digester Pilot Study

If you haven't done so, reviewing anaerobic digestion in "Wastewater Engineering" by Metcalf & Eddy would be a start.

Orenda

RE: Anaerobic Digester Pilot Study

If carrying out mesophillic digestion (~35 degrees C) then we tend to use a retention time of  12-15 days in the primary digestor (heated)and then a further 14-16 days in the seconday open top (ambient temperature) digester. We have found a total retention of 28 days gives us a product that has a greater than 5 log reduction in Ecoli, allowing the digested sludge to be use as fertiliser. As a broad rule of thumb you can get 2 cubic feet of gas per person per day.

You can digest SAS, but the performance in terms of gas yeild and digested sludge dewaterability will decrease the more SAS is in the mixture.

How big a pilot trial do you want to carry out? I've done trials on 5 litre upto 2 ton so can let you know what set up we used for either.





Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.