INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

sand shear

sand shear

sand shear

(OP)
Hi,
assuming Medium Subrounded SAND (0.25 - 0.5 mm) i would like to estimate the force required (virtually staight pull) to remove an umbilicle burried at 0.8m at a 30meter water depth.

Could someone point me in the right direction please?

thanks
Patrick

RE: sand shear

The water depth will not be a factor.  The diameter and length will be a factor.  This may be a case where a drawing would help (it's kind of hard to visualize the problem).

f-d

¡papá gordo ain’t no madre flaca!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources