INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Normal Fluid Service and Severe Service

Normal Fluid Service and Severe Service

Normal Fluid Service and Severe Service

(OP)
We are doing the required 5% RT on Normal Fluid service and we also have Class I Fluid Service with 100% RT.

My question is does the 100% RT go toward the 5% on normal or is it separate? I have conflicting answers on this subject.

Thanks

RE: Normal Fluid Service and Severe Service

What Code are you designing the system to?

RE: Normal Fluid Service and Severe Service

(OP)
B31.3

RE: Normal Fluid Service and Severe Service

In B31.3, what is Class I fluid service?

Appendix M and paragraph 300.2 list and define Normal fluid service, Category D fluid service, Category M fluid service and High Pressure fluid service.

Chapter VI (inspection. Examination and Testing) references those categories and severe cyclic conditions. No mention there about a "Class I fluid service".  ???

If the Code of record is ASME B31.3 Process Piping, design it to B31.3 rules.

RE: Normal Fluid Service and Severe Service

The title of the post is severe cyclic, which requires 100% RT or UT. However, many people misclassify systems as severe cyclic.  But if it is in fact severe cyclic, the 100% RT or UT requirements only apply to those portions of the system that are severe cyclic, that is, where the calculated stress due to thermal expansion and other displacement loading is over 80% of the allowable (+ more than 7000 cycles).  The 5% part and the 100% parts are treated entirely seperately with respect to examination.

RE: Normal Fluid Service and Severe Service

(OP)
B31.3 here....Okay so if you are postweld heat treating pipe (carbon steel) and 100 % RT after PWHT shouldn't the X-ray tech automatic assume it's graded severe?  I mean any 100% RT and PWHT is automatic graded sever on X-ray right?

Again please let me know where I can find the answer

RE: Normal Fluid Service and Severe Service

No, not necessarily. Many Owner's specify 100% RT examination for specific systems to normal service acceptance criteria under Table 341.3.2. It has been my experience that when examination to Severe Cyclic Conditions is to be performed, it is specifically stated either by the Owner or the Engineer.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources