INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HEC-RAS V4.0 - unstable at the initial time step

HEC-RAS V4.0 - unstable at the initial time step

HEC-RAS V4.0 - unstable at the initial time step

(OP)
Hi, All
I am currently building a large HEC-RAS V4.0 model for simulation of flood risks in a fairly large catchment 46sq km, including some urban area on one of the tributary.  We used HEC-GeoRas and extracted 1100~cross sections from LIDAR data, incorporated all the bridges and culverts.  The model went through successfully the prepressing and simulation stage but failed to pass the post prepressor.  I viewed the log file, it seems the water level went way over the top at the initial time step.  By the way, I boundary condition (flow data) were through a DSS path link to a HEC-HMS result file.

I am not sure if this is a problem with HEC-RAS V4.0 or is something wrong with the model files.  I wonder if any body have similar experience and can share.

Thanks in advance

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources