INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Engineering Hours for 4 -story timber motel

Engineering Hours for 4 -story timber motel

Engineering Hours for 4 -story timber motel

(OP)
We are puting together a cost estimate for a 4-story timber motel design. Can any body help me decide how many Structural Design Engineering Hours needed for this type of design? Thanks a lot.

RE: Engineering Hours for 4 -story timber motel

But sure you'd need to know the size, complexity, ground conditions cladding arrangement etc etc before you could start estimating. Thats like saying how much is a car?

RE: Engineering Hours for 4 -story timber motel

Luke,

There is a lot of work involved in this type of project. Abnormal loads mean that you need to check all members(including top plates e.t.c.) from scratch.

This is not a question that can really be answered in a forum.

RE: Engineering Hours for 4 -story timber motel

(OP)
thanks everyone, i understand it is not simple. I just want to get an idea to decide "go" or "no go". for eample, is 160 hrs enough for structural engineering design only? or just too much? thanks.

RE: Engineering Hours for 4 -story timber motel

I usually stay away from Calc-N-sketch only projects.  Start with the minimum fee for this work that you will be happy with for this job (and still win the bid), divide by the minimum hourly rate (times overhead factor) that you are willing to accept.  If your gut feeling says you can do the job within that time, go for it.  If not, stay away.

RE: Engineering Hours for 4 -story timber motel

Try figuring it up several ways and get a feel for a range of costs.  For example, estimate number of sheets and fee per sheet, estimate number of hours and fee per hour, estimate fee per square foot and estimate fee as a percentage of the construction cost.  Check out these numbers for your past projects and get a feel for what you've been doing and what you are planning to do with this project.  It's a bit of work but at least you'll have a feel for the numbers instead of throwing some hours at it.  

RE: Engineering Hours for 4 -story timber motel

Use 4% to 6% of the estimated construction costs and provide plans, elevations, sections, and details necessary for timber construction.  Include review of architectural, HVAC, plumbing, and finish schedule for structural coordination.

RE: Engineering Hours for 4 -story timber motel

4% to 6% sounds more like what a whole design team (architect, structural, electrical, mechanical, etc) gets for design fees for typical building projects.

In my part of the world, structural fees are generally in the order of 0.5% to 0.75% of construction costs. Maybe 1% if something is particularly complicated and the lead discipline is feel particularly generous that day.

RE: Engineering Hours for 4 -story timber motel

I generally use anywhere from 0.5% to 2% of the estimated construction cost for the structural portion.  I use the smaller percentage for the larger projects.  

I also use the estimated number of sheets with a cost per sheet (drafting plus engineering), and an estimated number of hours for the engineering, based on an engineering task breakdown.  I use the same number of hours of drafting as for engineering.

For residences I will use anywhere from $.075 to 1.50 per square foot, depending on the complexity.  That is just for the structural calculations and redline markups.  Drafting would be more.

I combine the three figures, and see whsat appears to be reasonable for the project, factoring in  simplicity, repetition, complexity, and other mitigating concerns.

Hope this helps.

Mike McCann
McCann Engineering

RE: Engineering Hours for 4 -story timber motel

My experience with this type of project is the Architect provides drafting, and no construction phase services are included, so my fee doesn't need to be so high.

For engineering and red marking the Architect's sheets, if the design is not overly complex, and you don't have to go to any meetings, 160 hours is too high. 40 to 80 hours might be more like it.

But like everyone else is saying, I know too little about the project to give you an accurate answer.

DaveAtkins

RE: Engineering Hours for 4 -story timber motel

I agree that if you base the fee off of construction cost structural is generally around .75%.  Sometimes more, sometimes less, depending on the type of work.

For a four story wood framed I would think that the fee would be 0.75% to 1% of the estimated construction costs.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources