INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Prestressed Concrete Pile to Cap Connection

Prestressed Concrete Pile to Cap Connection

Prestressed Concrete Pile to Cap Connection

(OP)
I'm trying to accurately model a pier in which two 18" prestressed concrete piles (one battered) will be tied together using a simple pile cap.  Since there will be significant lateral loading and need for moment transfer, I'm trying to find typical detailing for a simple moment connection.  The following are details that I've seen and/or used in the past:

1) Simply embed the pile 12" into the cap.
2) Embed the pile ~3-6" into the cap and expose the strands an additional 9-12".
3) Cutoff the pile 6" into the cap and dowel moment transfer reinforcement into the pile.

I read in the Florida DOT manual that 12" embedment into the cap would be considered a pinned connection and 48" would be considered fixed.  48" seems high to me so I was hoping there would be an alternative/optimized solution.

Anybody's thoughts/experience would be appreciated.

Thanks.

RE: Prestressed Concrete Pile to Cap Connection

#2 and #3 are most widely used.

RE: Prestressed Concrete Pile to Cap Connection

(OP)
But these would both of these be considered fixed?  Strands usually need quite a long development length so I'm hesitant to assume that this is 100% effective.

RE: Prestressed Concrete Pile to Cap Connection

I have done this by embedding conventional reinforcing bar into the top of the piles. The grout may take the form of a high strenght epoxy resin which will not need a large anchorage depth- manufacturers details should be consulted.

RE: Prestressed Concrete Pile to Cap Connection

I did my thesis on something similar, it was steel piles into a cip pile cap.  what I noticed along with research is that if you have embed the piles 2 diameters into the cap it will act the same as if you had steel connecting the two with rienforcing.  Of course you must think about the size of the cap as well.  My recommendation would be to embed the piles a development length above the centroid of the cap and forget the reinforcing.  If you treat the lateral force as a point load that acts at the centroid of the cap then you must embed the piles above this centroid such that shear cracking can't fully develop.  The spacing of the piles is also a consideration.  Look up the name Mowka, he's done a lot of research on this topic.  Of course things change when the material changes too, I never tested precast.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources