INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Filling a lot while maintaining a proposed septic field

Filling a lot while maintaining a proposed septic field

Filling a lot while maintaining a proposed septic field

(OP)
I am working on a rural subdivision in which each lot will have it's own mound system.  During construction, we typically stake and rope off the proposed septic fields so that they are left undisturbed during construction.  The issue I am running into is that the one lot has to have 2' of fill placed on it in order to allow for proper drainage.  If I was to add this fill and leave the septic area untouched I would basically have a 2' foot depression for the septic field.  I know that this would not be allowed so looking for some alternative solutions.  Most people I've talked with have said that I need to basically install the mound system the same time as the mass grading of the site.  Wondering if we could mass grade site as normal but then for the septic area add additional fill but place will a low impact dozer.  Then when someone buys the lot they could remove the fill down to the natural earth and construct the mound system?

RE: Filling a lot while maintaining a proposed septic field

Why do you say the depression will not be allowed?  The rules for septic systems are published for the state you are in and vary from state to state.  Some states allow multi level septic areas using splitter box to assure porportional flow to each level.  Most rules are for the distance to waterways, wells and property lines.  As long as the depression daylights,(not a pond), then I seee no reason it can not be a septic system location.

RE: Filling a lot while maintaining a proposed septic field

(OP)
Thanks for the reply.

Since the entire lot has to be filled I cannot daylight the depression.  The site is extremly flat and I have to add the 2' of fill so that the lot is higher and drains to a proposed detention pond.  If I daylight the depression it would be lower than the pond's berm and would ultimately fill with water.

RE: Filling a lot while maintaining a proposed septic field

You already have the only good solution.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: Filling a lot while maintaining a proposed septic field

Doesn't a sand mound require 2' of sand fill? Could it be possible that your mound becomes flush with the surrounding ground?

I have created a sand mound design spread sheet. I'd like you to check it with your design and let me know if it is comparible.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources