What kind of separation is required for excavating under 62KV electric lines? We don't want to have any arcing.
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
Digging under High Tension Electric Lines
|
Digging under High Tension Electric LinesDigging under High Tension Electric Lines(OP)
What kind of separation is required for excavating under 62KV electric lines? We don't want to have any arcing.
Red Flag SubmittedThank you for helping keep Eng-Tips Forums free from inappropriate posts. Reply To This ThreadPosting in the Eng-Tips forums is a member-only feature.Click Here to join Eng-Tips and talk with other members! |
ResourcesWhat is rapid injection molding? For engineers working with tight product design timelines, rapid injection molding can be a critical tool for prototyping and testing functional models. Download Now
The world has changed considerably since the 1980s, when CAD first started displacing drafting tables. Download Now
Prototyping has always been a critical part of product development. Download Now
As the cloud is increasingly adopted for product development, questions remain as to just how cloud software tools compare to on-premise solutions. Download Now
|
RE: Digging under High Tension Electric Lines
RE: Digging under High Tension Electric Lines
“Discussion: OSHA regulation 29 CFR 1926.600(a)(6) requires that boomed earth-moving vehicles comply with the requirements of 29 CFR 1926.550(a)(15) when working or being moved in the vicinity of power lines. This standard specifies that the minimum clearance between electric lines rated 50kV or below and any part of the boomed vehicle shall be 10 feet, unless the electrical lines have been "deenergized and visibly grounded" at the point of work. A 10-foot clearance would ensure that the vehicle would not contact and cut the overhead line, as in this incident, or become energized because of the contact. When a 10-foot clearance is difficult to maintain by visual means, a designated person can observe clearance between the lines and the equipment and give timely warning of imminent contact to the operator, or the local utility company should be contacted to deenergize the power line before work starts.”
While I could see some argument that this might be quite difficult to maintain in some situations; there is certainly no doubt one needs to maintain some reasonably safe distance and particularly from highly energized lines! (and I think the above contains at least some generally good thoughts/suggestions in this regard)
RE: Digging under High Tension Electric Lines
There is where your question should be.
RE: Digging under High Tension Electric Lines
RE: Digging under High Tension Electric Lines
RE: Digging under High Tension Electric Lines
RE: Digging under High Tension Electric Lines
The distance can also vary with the weather conditions too, specifically the humidity.
Mike McCann
McCann Engineering
RE: Digging under High Tension Electric Lines
RE: Digging under High Tension Electric Lines
http
RE: Digging under High Tension Electric Lines
http://www.dir.ca.gov/Title8/2946.html
RE: Digging under High Tension Electric Lines
it's about halfway down (after the case descriptions)
50 to 200K 15 feet.