INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

spec break

spec break

spec break

(OP)
hi all,
pls can anyone tell me why we need a spec break in a piping.
 

RE: spec break

You got to give more details.
Temp, Pressure, medium.

Greetings

RE: spec break

In general, if you change pipe materials (i.e. pipe specificaiton) and/or the service fluid in a continuous pipe run, you need a spec break.

RE: spec break

How about if you also change the design specification?

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdoweb/

RE: spec break

All of the answers you have been given above are correct for the theory of a "spec break" in a piping system.

Now let's look at  the mechanical placement of a "spec break"

First a "spec break" happens where there is a change from one significant design condition to another.
One example of this is a Pressure Safety Valve (PSV).  Up stream of the PSV there is a design condition with a higher pressure normally requiring a higher "spec".  Down stream of the PSV there is a flare collection system (or atmosphere) with a much lower design condition.  Therefore there would be a "spec break" at the downstream side of the PSV.

There is also the situation that occurs at control valves.  If it is a Pressure Control Valve (PCV) there will be a higher pressure on the upstream side and a lower pressure on the down stream side.  With this control valve there are other valves involved.  There are the up stream and down stream block valves which allow for the removal or maintenance on the PCV without shutting down the plant.  There is also the bypass (globe) valve used to throttle the flow when the PCV is out of operation.  For a control valve situation the "spec break" shall be on the down-stream side of the bypass globe valve and on the down-stream side of the downstream block valve.  To say it another way, all valves in this control valve station would be the higher spec.

I hope this helps

RE: spec break

Pennpiper, I agree completely with your statements, but would also point out that in a proper design you would have a PSV downstream of the control valve (set appropriately) if you want to have a spec break to a lower-rated materials.

RE: spec break

Another way to answer your question is: due to costs.

You can go with a higher pressure spec for all of your piping system, even when you don't need it, but it would not be cost effective.

So, after a control valve where the pressure is dropped (from 600# - 300# ANSI), you can go with a lower pressure spec, because it is more cost effective.

"Do not worry about your problems with mathematics, I assure you mine are far greater."   
Albert Einstein
Have you read FAQ731-376: Eng-Tips.com Forum Policies to make the best use of Eng-Tips Forums?

RE: spec break

I highlight as a spec break a change in design code.  Most typical id B31.3 to B31.8.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources