INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Well Test

Well Test

Well Test

(OP)
Hello all fellow engineers,
My problem has been the accuracy in well testing at the offshore location & this has resulted in problems with forecast's.
The oil producer via the test header is lined to a 2 phase separator & the outlets join each other ( Gas phase + oil & water) before exiting to the oil manifold. This increases the back pressure by around 20 psi which is not accounted for in the test.
Another problem i face is the water cut measurements.(for high water cut wells how do you measure the BS& W? Our guys have been using a measuring cylinder instead of a spinner.As the fluid cools down the volume change sets in. Also how do we compensate for the temperature changes.

Do we have any formula's or software for compensating the pressure increase & temperature changes????

Yet another one is the well test frequency & how long should the test be performed?? Like we do 4 hours test every week.

RE: Well Test

John,

Bottom line your Production or Reservoir Engineers need to answer this.
However as long as you have the test separator pressure and basic PVT analysis Pressure, GOR, expansion factor, Bo etc. you should be able to work everything out.

Not sure that I follow on your BSW readings. Yes they need a spinner and also as water is virtually incompressible at the temperatures you will be at (200 psi test separator ?) this should be so small as negligible.

As for software - PETEX (Petroleum Experts) have a good package that does just about everything around thsi (and a lot more).  

RE: Well Test

John,

You can use the RedEye water-cut meter (Near Infra Red technology) to measure the BS&W in the liquid leg of the 2 phase separator. This meter has great accuracy in the higher water-cut range and works in the 0-100% water-cut range.

Now, you would also need a flow meter (turbine meter should be OK, if your separator works fine), as the water-cut is a flow-rate weighted quantity. This set-up should help you with better well-testing and production forecasts.

As for the Pressure (20 psi) and temperature effects on your test volumes, it should not be much. Hoe much difference are you seeing in your test volumes and real volumes?

8 hrs test once a week should be fine. If you are seeing big differences in the volumes, just have that well tested for continuously (4 tests) for 48 hours and look at the numbers you get.

Hari Aum

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources