INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Silo PVSV's

Silo PVSV's

Silo PVSV's

(OP)
A plant is constructed with hoppers (silos) to store the finished dry resin product.  The silos are 8900 cu. ft. capacity, SA516 gr 70 material, design pressure 3.6 psi, static head 24 psi.  The silo was constructed per API 620, and is ASME code-stamped. Material is pneumatically conveyed to the silos and a dust collector is provided on top of each that vents to the atmosphere.  My question is, is a PVSV still required?  Or maybe just good safe practice?  I have worked in PVC, and all silos had at least pressure relief on a separate nozzle in addition to the dust collectors, even if the dust collectors had high differential pressure alarms.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources