INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

MSD Development

MSD Development

MSD Development

(OP)
All:

I am trying to develop MSD's from available PFD's. Right now we do not have equipment datasheets,We only have pipespecs available, would that information be enough for the MSD's.
What other information do I need?

Any help would be appreciated?

Regards,
npf

RE: MSD Development

(OP)
All:

I forgot to add, I have Material Selection Design Basis Document available listing matieral requirements for key equipment items.

Regards,
npf

RE: MSD Development

The basis to start develop a MSD is a Material Selection Report, or maybe you can call it Material Selection Design Basis Document.
The important thing is that this document explain clearly what are the assumption, calculation, standard, and the criteria adopted to select the material for at least the main stream and item of your plant.
I've seen sometimes people that develop P&IDs without a Material Selection Report and discover that they have to change all the materials.
So, this is my suggestion,before you start develop anything be sure that you have a "solid" document produced by someone with experience in Corrosion & Materials Selection.

Regards

S.

http://www.corrosionist.com

RE: MSD Development

I agree with strider6. There has to be first a design basis document, Material Selection and Corrosion Control that describes the material selection criteria and corrosion control strategy like material selection, surface preparations and coatings, cathodic protection, chemical injection and corrosion monitoring systems. All this data shall be depicted in the MSD's in order the PID's to be issued accordingly.I think equipment data sheets and piping material classes specs are enough for a preliminary stage.In MSD you have to define the base material, corrosion allowance, internals/valves trim, internal coatings if any, service, design pressure and design temperature,required cathodic protection, chemical injection and corrosion monitoring points if any.GOOD LUCK!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources