INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Straight reduction pipe after deluge valve

Straight reduction pipe after deluge valve

Straight reduction pipe after deluge valve

(OP)
Hello,
I´ve been observing a deluge system and have come across a doubt that no one has been able to explain it in a satisfactory way yet. It's an onshore deluge system. the circuit is as follows:
After the 4" deluge valve installed vertically I have a 4" locked open blocking valve, 3 90° elbows for making the pipe direction horizontal, an excentric reduction (4 x 1 1/2"), a straight galvanized pipe (schedule 160) of 1 1/2 " of about 1,5 meters long, another excentric reduction (4 x 1 1/2") and finally the 4" non-galvanized Schedule 40 pipe that goes undergroud to provide water to the sprinkler system.
My question is why this straight pipe of 1 1/2" is installed?
anyway...thanks in advance.
Pipo

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources