FEMA Flood openengs near BFE
FEMA Flood openengs near BFE
(OP)
Are FEMA flood openings required for a garage where the slab is above the base flood evelation, but not above the 1' of wet-floodproofing freeboard required? I can't find anything in writing that says this is exempt, but as the design requirements state that the design should reflect a 1' difference, it seems moot.





