INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Flush plan 31 - orifice location

Flush plan 31 - orifice location

Flush plan 31 - orifice location

(OP)
Reagarding the flush plan 31 with orifice plate

It is normal to have the orifice on the suction line of the pump. (under the cyclone)

My understanding :
1. outlet recirculate to the cyclone
2. clean part goes to the gland *mechanical seal
3. dirt go to the suction line, but through an orifice.

By doing it like this, do you think the orifice will always be plug.  (my application are caustic centrifugal pump and water pump)

Thanks,

RE: Flush plan 31 - orifice location

In my experience, all three lines connected to a cyclone are orificed.  But, the orifices in the dirty and clean outlets are usually built in as part of the cyclone design.  The orifice that is variable is normally the one on the inlet to the cyclone.  I only ever recall seeing one cyclone with a separate orifice on the clean outlet.  And I have never seen one with an orifice on the dirty outlet.  The correct configuration depends on the design of the cyclone.  The particular cyclone would have been designed for a range of inlet flows and this design should dictate the correct location and sizing of all orifices.  You must consult with the cyclone manufacturer for their requirements

Johnny Pellin

RE: Flush plan 31 - orifice location

I usually try to put the orifice where the largest leak could be expected if seal tubing breaks.  In this case it would be on the cyclone inlet, close to the pump discharge.

Agree with JJPellin, flow split between clean and dirty should be built into the cyclone itself.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources