INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pile convergence check vs. Superelement

Pile convergence check vs. Superelement

Pile convergence check vs. Superelement

(OP)
We are using SACS computer software for designing fixed offshore platforms. On pile convergence check for a certain platform, we found difficulty to achieve pile convergency to an acceptable level (deviation below 10% for pile rotation & deflection between Post and single Pile run). Our client suggests to use Superelement. We are not familiar with the method. Can anybody explain what is this or what is the difference with pile stubs for convergence check ? Another question, is it more conservative ?
Thank's in advance for any information.
    

RE: Pile convergence check vs. Superelement

I take it you have looked at the section, Section 6.6 "Trouble Shooting Common Problems" in the "SACS PSI/PILE Users Manual"?  This .pdf file is accessed through the SACS Executive.

There are listed various options or common modelling glitches that cause a pile problem to not converge.

The SUPERELEMENT part of SACS used to be used to model part elements of an overall structure as a stiffness matrix so to reduce the size of the SACS model.  This originated in the days when computing power was more limited.  Nowadays with the Release 5 and upwards of SACS, model sizes are unlimited and high speed processors mean very complicated models take only a short time to run.  Hence SUPERELEMENT tends not to be used these days.  It would not be more conservative to use a superelement, just more complicated.  

If you have played with the model in line with the suggestions in Section 6.6 and you are still having problems, you should send the model, output and run files to EDI, the software people and see if they can help.  I have found them very quick to respond.

You can do this if you have been keeping up with the software maintenance fees!

Hope this has helped.
 

RE: Pile convergence check vs. Superelement

The Superelement (6 x 6 matrix) is used when performing dynamic applications (vibration, fatigue, eismic etc).. it is the recommended method to be used for such analyses.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources