INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Frost depth

Frost depth

RE: Frost depth

If frost depth is fairly shallow, I will set the bottom of grade beam elevation below the frost depth so void forms are not needed.

If frost depth is deep though, I size the grade beams as needed for the loads and put void forms below them to handle any frost heave.

RE: Frost depth

(OP)
well, I need the void form due to expansive soil, so it will be installed no matter what.  Also, the main level is about 4 ft from finish grade.  The frost depth here is 3 ft.  Thefore, in order to set it at frost depth we need to make the wall about 7 to 8 ft tall.

OR shall I just make the bottom of the wall slightly lower than the finish grade?  

RE: Frost depth

If you will be using void form anyway then there really is no benefit in lowering the bottom of the grade beams.  I would probably set it around a foot below grade anyway to make sure the bottom does not become exposed for whatever reason.

RE: Frost depth

I always put the bottom of the grade beam, not the bottom of the void form, below frost level.  The void form, when used, is below the grade beam wherever that is located.  If the frost level is shallow, then I put the bottom of the grade beam at least 24" below finished grade to help avoid the effects of moisture changes in the soil thru-out the year.

The overall depth of the grade beam might be affected by the span between the piers.  If you have a wide pier spacing, the grade beam might need to be deeper than 24".  Obviously, a grade beam is typically a multi-span member, but beam depth is also based on span and not just frost depth.

RE: Frost depth

AlmostPE,

See what depth you need the grade beam to avoid using shear ties and then make your decision from there based on how much extra you need to bring it below frost depth.

csd

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.