INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Excavation Support û Secant Wall

Excavation Support û Secant Wall

Excavation Support û Secant Wall

(OP)
I have two jobs that required shoring and sheeting. The 1st job is along the river and requires a 20 feet of excavations.  The sheeting system will have to penetrate through till (N>50).  The preliminary analysis shows that the minimum length of sheeting is 32.  At 30 feet mudstone bedrock is encountered as well.  I don’t think sheeting can be used or can be driven through the till.  I’m thinking of a Secant Wall (cofferdams).  The client is also requesting to take a look into soil cement mixing wall to act as a cutoff wall as well. What reference I could use to design these systems.  

The 2nd job is for basement excavation and it’s surrounded by buildings and rail roads.  drilled system is a must. What kind of system I should use in this situation where groundwater is an issue.  

RE: Excavation Support û Secant Wall

Geoperson,

You will have to drill in your shoring for the first job. You may wish to consider a jet-grout cutoff in place of soil-cement mixing. In any event, you will have to ensure that windows between your piles are kept to a minimum. With a 20-foot excavation with only 10 feet of embedment, I suspect you might need some sort of lateral restraint (tieback, anchor, etc.) in addition to the plain wall section unless you key into the rock with the toe of you pilings.

In both cases, you don't really describe the geotechnical and hydraulic setting very well. Give us a better description of the soil and water conditions at each job.

Jeff

RE: Excavation Support û Secant Wall

(OP)
Jdonvill,
The geotechnical Info for the job #1 is as follow:
0-10’ Fill/ 10'-22' Till (cf SAND, some Silt, some Gravel)/ 22'-30' weathered rock. Silty CLAY, some gravel, little Sand/ 30’ mudstone bedrock. Groundwater is at 10'. The river runs along the excavation and therefore I can’t use tieback or anchors.  
The client for the Job#2 is talking about using Soldier Beam and Lagging system. I haven't got the geo report yet, but I know the GW is shallower than the bottom of the excavation.   

I’m planning on using Secant wall for job#1, but if there is anyone knows of a good reference to use to guide me through the calc and specs.  

RE: Excavation Support û Secant Wall

GeoPerson,

Call Moretrench in Rockaway, NJ (973-627-2100).  They do dewatering, ground freezing, grouting, sheeting, tieback anchors, underpinning, etc.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.