INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Effective Moment of Inertia - Precast Stairwell

Effective Moment of Inertia - Precast Stairwell

Effective Moment of Inertia - Precast Stairwell

(OP)
Lets say you have a stairwell, made out of 4 precast walls.  These walls are connected at the corners with welded steel connections, designed for the forces experienced at the joint interfaces.

What would the effective moment of inertia of the box be in this case?  If I compare the above system to a solid cast-in-place concrete monolithic box, I would guess that the precast system would have an effective moment of inertia somewhat less than the CIP option.  This is due to the fact that the connections would be designed to yield under the ultimate loads, and then they would allow relative displacements between the members.

To calculate the forces on the connections, I would assume you need to look at Vq/Ib.  So then you need to know what the moment of inertia "I" is to get a force, but you don't really know what "I" is until you design a connection??

What is normally done for this type of situation?

RE: Effective Moment of Inertia - Precast Stairwell

Hi WpgKarl,

The Moment of Inertia is not affected by the connections.

Design the connections for the Moment of Inertia.

Don't forget to check the bearing resistance of the concrete, as the bolts bear on the concrete, as well.

HTH

VOD

RE: Effective Moment of Inertia - Precast Stairwell

You can easily calculate the moment of inertia assuming its a box shape. Then use this moment of inertia to calculate the shear transfer.

The shear connectors need to be designed assuming that full section (all elements in the box) will contribute to moment of inertia.

RE: Effective Moment of Inertia - Precast Stairwell

v = VQ/It

RE: Effective Moment of Inertia - Precast Stairwell

If you have an idea who the precaster might be, you may want to see if they really want to deal with the connections that would be required if you treat the stairwell as a box.  I worked on a major all precast project in the Denver area where the precaster wanted to just analyze straight shear walls without consideration for the flanges, so that they would not have do deal with the connections required for box action.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources