INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hybrid chiller plants

Hybrid chiller plants

Hybrid chiller plants

(OP)
We are evaluating an alternate for an 800-ton chiller plant. One of teh alternates we intend to study is a Hybrid chiller plant using (1) 400-ton adirect fired absorber, (1) 300-ton cnetrigugal chiller; and (1) 100-ton screw chiller (which is intended for the 24-hour cooling).

When you figure a Hybrid chiller plant, at what tonnage does a Hybrid starts making sense (I've heard of around 1000-ton).
What percentage Absorber/Centrifugal do you normally use (60% absorber/40% cnetrifugal?)

We also intend to model a variable primary flow, any draw backs in using VPF with absorbers?

The project is a 250,000 SF new office building in the mid-atlantic area of the US.

Thank you

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources