Task Scheduler won't run
Task Scheduler won't run
(OP)
Hi All,
I'm just getting started using the Task Scheduler but how long does it usually take to start a task?
I asked it to convert the drawings in a folder to eDrawings, and I'd waited 15 minutes and the tast hadn't started to do anything yet, it just said scheduled, but I'd set it to start at the current time.
Does it take time to load the current files, or is it better to select the files individually?
Thanks
I'm just getting started using the Task Scheduler but how long does it usually take to start a task?
I asked it to convert the drawings in a folder to eDrawings, and I'd waited 15 minutes and the tast hadn't started to do anything yet, it just said scheduled, but I'd set it to start at the current time.
Does it take time to load the current files, or is it better to select the files individually?
Thanks
60% of the time, it works every time.






RE: Task Scheduler won't run
RE: Task Scheduler won't run
Regards,
Scott Baugh, CSWP![[pc2] pc2](https://www.tipmaster.com/images/pc2.gif)
FAQ731-376: Eng-Tips.com Forum Policieswww.scottjbaugh.com
RE: Task Scheduler won't run
Is that just the solidworks application?
60% of the time, it works every time.
RE: Task Scheduler won't run
Regards,
Scott Baugh, CSWP![[pc2] pc2](https://www.tipmaster.com/images/pc2.gif)
FAQ731-376: Eng-Tips.com Forum Policieswww.scottjbaugh.com
RE: Task Scheduler won't run
I just rebooted my laptop and lo and behold the tast began to run.
60% of the time, it works every time.