INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

precast bearing on grade beam

precast bearing on grade beam

precast bearing on grade beam

(OP)
I have a 12,000 lb 6" thick precast panels that will bear on my continuous grade beam.  Assuming during erection there will be two bearing points that will each take 6k.  The ledge (like brick dap) is 6" wide so panel bearing will be centered as close to edge of concrete as 2 1/2 inches.  Let's say they use 4" bearing plate, what kind of shear failure plane would I be looking at?  Similar to corbel analysis?  

tw

RE: precast bearing on grade beam

To avoid the problem, put in temporary metal shim plates at 4 foot centers until the wall can be continuously grouted between it and the strip footing.  No worries.

Mike McCann
McCann Engineering

RE: precast bearing on grade beam

Is the bearing direct onto the grade beam, or are bearing plates cast into the grade beam? While a loose bearing plate theoretically spreads the load at the bearing point, in reality the plate sits non-uniformly on high points.  You may want to use elastomeric or similar bearing pads to be sure you are spreading the load as designed at each of the two main bearing points. If you assure transfer, then you can lengthen the bearing plates. That will help a little.  You could also have. at each bearing point, two shim stacks about 18-24" apart with an adequately thick steel plate between them. That would spead the load.  

Intermediate shim points present a similar issue in that the load, at least at some moments during installation, will bear only on two points (thats what defines a straight line - the panels will not deform to put load on the added points).

www.caryconcrete.com

RE: precast bearing on grade beam

First, you need to check if your bearing has enough area that will not cause bearing failure in the ledge or in the grade beam.

Secondly, you can use shear friction analysis to design the reinforcing for the ledge.

You also may need to increase the load to allow for any sudden impact during erection.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources