INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hand Calculation Verification

Hand Calculation Verification

Hand Calculation Verification

(OP)
are companies required to perform hand calculation verification for such programs as Compress and APV?

RE: Hand Calculation Verification

My understanding is that if you use some software for calculations then there should be some proof that the calculations provided are correct.

I use MathCAD and our ASME AI requests that once a year I perform some hand calculations on the my templates to ensure that the software behaves as expected.

It's simply an audit of the software.

You may be lucky, the software vendor may provide some proof for you to very against, worth a phone call.

RE: Hand Calculation Verification

In all of our Joint Reviews for our Code Ceritificates of Authorization, we have been requested to support our computer program calcs with hand calcs.

RE: Hand Calculation Verification

If you're responsible for the results, you need to assure yourself in some way that those results are reliable.  Read the guarantees furnished by the software vendor and see how much liability they are willing to pick up for their product.

On occasion, I see people using software as a substitute for knowledge and understanding, which can be a dangerous thing.

RE: Hand Calculation Verification

Verification of your software before you use it is required according to your QC system and this must be documented for the AI.  Ideally your software should be checked thoroughly every time you receive an update but most people do a few simple calc's such as heads and shell just to say they've been done. You can check your software by doing some manual calculations or comparing them against another program.  A good idea is to use the examples in Appendix L and Part UHX as a comparison.
By the way, I've used Codecalc, PVElite, Compress and APV among others and I have found errors or ommissions in all of them.

RE: Hand Calculation Verification

I have verified every build of compress with calculations using mathcad. basically I calculate mostly used elements like shells, heads, tubesheets.
It's a bit annoying since compress is well verified (and documented as well) by codeware in my opinion. I use older (and sometimes buggy) software until latest build is verified.
It's true that designers should be familiar with calculation programs and verification of program surely helps in that, but in my opinion software verification should be only software verification but nothing else.

RE: Hand Calculation Verification

Yes, you should provide the hand calculations. Not all are necessary. This is just a verification showing that the software is right. Two or Three calculations are enough and it should be signed by the Engineer and he will be the responsible person.

RE: Hand Calculation Verification

wsmith22 (Mechanical)

Compress Verificatin and Quality Assurance Manual was provide to DOE January, 2006. A06 COMPRESS Verification Manual. http://www.codeware.com/support/manuals/verification.pdf


COADE: PVElite/CodeCalc Verification and Quality Assurance Manual you can buy from COADE.

APV contact APV.

RE: Hand Calculation Verification

In my experience, human error during input data for software is the major problem.

Computer saftware can save your time. Hand calculation may be required for the critical points for verification.

RE: Hand Calculation Verification

wsmith22 (Mechanical)

Reference Note:

PVElite/CodeCalc –2005 QA Manual Check 4-17 WRC 107 Checks This example is compression with http://www.CODEWARE.com Compress Using WRC 107 March 1979 Version.

Tomtation (Mechanical)
A better idea is to use the CD: ASME International ASME Boiler & Vessel Pressure Code ZCD699 for comparison. Also, examples in Appendix L and Part UHX as a comparison.

Regards
Leonard Stephen Thill

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources