INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

shear reinforcing at construction joint

shear reinforcing at construction joint

shear reinforcing at construction joint

(OP)
I find myself designing a 15'-0" tall, 14" wide concrete retaining wall, which will sit directly on 24" diameter piers, spaced at about 8'-0" o.c.  There is an 8000# lateral load, per foot of retaining wall, that I must transfer into the piers.

Naturally, the contractor will pour the piers and the grade beam separately, so there is no shear value from the concrete itself.  So, I need to provide some embedded rebar dowels, sticking straight up out of the piers.

I approached this by trying to use ACI equation 11-17, but it basically doesn't allow for the bars for this orientation.  I suppose I could call for the bars to be installed at an angle, but it seems unnecessary for this application, for just providing shear transfer at a construction joint.  And it looks funny, and I just know that this can work the way I'm thinking...

Of course, I could just calculate the rebar shear strength as As*Fy*0.4, and maintain adequate edge distances and spacings.  Is this the right way to go?

Help!  And thanks in advance.

RE: shear reinforcing at construction joint

You should use section 11-17 - Shear Friction in ACI 318.

Specifically use equation 11-25 with the max. value of φVn as indicated in 11.7.5.

RE: shear reinforcing at construction joint

Look at equation 11-25 in 11.7.3.1 (ACI 318-05) for shear friction.

RE: shear reinforcing at construction joint

Along with transferring shear, don't you have to transfer moment as well thru the joint?

You want to install the bars at an angle, is this to follow the slope of the retaining wall? If so, rather you can install prebent rebars with straight legs in the pier and bent leg sticking out for secondary pour.

While designing the reinforcement, you have to consider the combined effect of shear and bending.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources