INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

3 transformer bank loading

3 transformer bank loading

3 transformer bank loading

(OP)
reference to thread238-143892: Advantages and Disadvantages of Transformers connections


Also, when a 3-transformer bank is operating 3-wire wye primary 3-wire delta secondary a single phase secondary load divides 2/3 into the transformer that directly connects to the single phase load and the other 1/3 of the current through the other 2. Why is this?

RE: 3 transformer bank loading

I always thought that the current divided 50%-50%.
The two out of phase transformers form an open delta. The open side of the open delta becomes a virtual transformer with the same basic characteristics as the in phase transformer.
respectfully

RE: 3 transformer bank loading

I can show an analysis in the sequence component approach, but not in the ABC world.
    The single phase load on the delta secondary is a phase to phase load. Note this is similar to a phase to phase fault, and recall from phase to phase fault analysis,
  I1=Ifault/sqrt3
  I2=-I1
  I0=0
Assume Iload, single phase = 1.732<0. The equations above will give:
  I1=1<0
  I2=1<180
  I0=0
Assume the primary leads by 30deg. Recall also that if positive sequence leads, then negative sequence lags. Hence, current on the Wye (primary) side is:
  I1=1<30
  I2=1<150
  I0=0
Convert to the ABC world, and this is:
  Ia=1<90
  Ib=2<-90
  Ic=1<90
Want a real easy ABC<>012 calculator/conversion program? Go to:
  http://users.ece.utexas.edu/~grady/
and look for "ABC012".

RE: 3 transformer bank loading

(OP)
Thanks for the post.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources